
**
The development work of the highly important 'Eidgah Road' in Daganbhuiyan municipality has not been completed even in a year due to the nuisance of illegal structures and encroachers. The construction work remains stalled as the boundary wall of the Eidgah beside this 24-foot-wide road, including the drain, and illegal shops built over the canal have not been evicted. Although the municipality has issued notices 3 times, as the encroachers have not removed the structures, bricks, sand, and cement left on the road are getting ruined. Consequently, this main connecting road for alleviating city traffic congestion has instead become a cause of extreme public suffering. **
According to municipal and local sources, this road is known as a 'lifeline' for relieving the severe traffic congestion of Daganbhuiyan market. It establishes direct connectivity with the Choumuhani regional highway and Basurhat road. Considering the importance of the road, the municipality started the construction work of the 24-foot-wide road including a drain about a year ago. However, the Eidgah boundary wall covering a large part of the road and the illegal shops and structures built by occupying the space of the canal could not be removed yet.
As the work remains halted, valuable construction materials such as the contractor's bricks, sand, and cement lying beside the road for a long time are getting ruined in the sun and rain. Although 3 rounds of notices were issued by the municipality to the concerned parties to demolish the illegal structures and proceed with the road work, it has yielded no results.
Read next Fear of erosion on new char and agricultural land in Meghna river at Nabinagar; District Commissioner assures joint force operationLocal businessmen and general pedestrians are angered by such a dismal state of the road. Expressing anger, a local sufferer who regularly commutes through that road said, "The road has been dug up and left like that for a year. With a little rain, it turns into a mess of mud and water, and in the sun, it's impossible to endure the dust. Thousands of people are suffering every day because of illegal encroachers, yet the structures are still not being demolished."
**
When asked about the slow pace of work and obstacles, Daganbhuiyan Municipality Engineer Saiful Islam said, "We want to finish the work quickly. But the Eidgah boundary wall and some illegal structures over the canal remain inside the road's alignment. Unless these are removed, it is technically impossible to complete the main work of the drain and road. As the work is suspended, construction materials are also being ruined."**
Regarding this, Daganbhuiyan Municipal Administrator Shahidul Islam stated, "The matter of public suffering is in our notice. The municipality has already issued notices 3 times to remove the illegal structures occupying government land and canals. Since they did not remove the structures on their own initiative, an eviction drive will very soon be conducted through a mobile court to finish the road work in a short time."
— Daily Best News Desk • Fearless in the search for truth
Reported by Md. Fakhrul Islam, Feni • Edited by the Daily Best News desk. Send corrections to [email protected].









