
Allegations have surfaced over the use of substandard bricks and sand in the construction of an academic building at Gyaniganj High School in Pirgachha upazila of Rangpur. Beyond construction materials, a government project signboard was reportedly nailed directly into a living tree in disregard of environmental norms, alongside allegations regarding the appointment of an Awami League leader as president of the school's managing committee. Frustration has grown among locals over the quality of work and supervision, leading residents to temporarily halt construction over alleged irregularities.
An on-site visit to the school on Saturday (November 21, 2026) revealed various anomalies in the construction work and the way the signboard was put up.
According to details on the project signboard, a single-story academic building with a four-story foundation is being constructed at the school under Revenue Code No. 7016 (SHED) of the Secondary and Higher Education Division under the Ministry of Education. The project has a tender value of Tk 1,28,20,275, with the work order issued on August 16, 2026, and a stipulated duration of 12 months. The signboard names M/S Milon Construction as the contracting firm, while the Education Engineering Department, Rangpur, is responsible for implementing the work. However, locals claim the work is being carried out under Alhaj Ronju Mia.
Local resident and BNP leader Md. Nur Islam and Ward No. 2 Juba Dal President Mosharaf Hossain told journalists that inferior-quality bricks and sand are being used in building the school structure, while the project signboard was nailed into a living tree trunk without regard for the environment. They alleged that environmental protection is being ignored despite the development project being publicly funded.
Expressing anger, local resident Royal Sarkar said irregularities are occurring from the formation of the school's managing committee to the building construction, alleging that the engineer responsible for supervising the work has not been seen at the site even for a single day.
Concerns over irregularities also emerged during conversations with Jahangir Alam, who oversees the construction work. Several local residents objected to the quality of work and temporarily stopped construction.
Contacted by phone, school headteacher Abul Kalam Azad acknowledged that substandard bricks were used in the construction and said environmental harm was caused by nailing the signboard onto a living tree.
Conversely, contractor Alhaj Ronju Mia denied all allegations, claiming the work is being executed according to estimate and that no irregularities have occurred or will occur in the future.
Discontent persists among locals over the alleged use of low-grade materials in a multi-crore-taka government project, questions about regular engineering supervision, nailing a signboard into a living tree, and the appointment of the managing committee president.
Locals have demanded an impartial investigation into the allegations to verify construction quality, ensure oversight by responsible engineers, and look into the managing committee presidency, calling for proper use of public funds to build a safe, quality structure for students.
— Daily Best News Desk • Fearless in the search for truth
Reported by Sheikh Majnu Shah, Pirgachha(Rangpur)Correspondent • Edited by the Daily Best News desk. Send corrections to [email protected].








