
Petrobangla (Bangladesh Oil, Gas and Mineral Corporation) has urged consumers not to pay heed to rumors claiming a complete 4-day gas shutdown. In an official press release issued on Tuesday, November 3, 2026, the state energy corporation clarified that gas supply will not be completely cut off, though daily supply will be reduced, leading to potential low pressure in some areas over the next four days.
The temporary reduction is due to routine maintenance work on one of the country's two Floating Storage Regasification Units (FSRUs)—specifically the terminal operated by Summit Group in Moheshkhali. As a result, national daily gas supply will drop by approximately 320 million cubic feet per day (MMCFD), bringing total daily supply down from 2,570 MMCFD to 2,250 MMCFD. Full gas supply is expected to be completely restored by 4:00 PM on Saturday, November 7, 2026.
Read nextIslami Bank Records ৳3,286 Crore Loss in First Nine Months of 2026 Amid Leadership Crisis and Surging Default InvestmentsA senior Petrobangla official confirmed that Summit Group initially requested maintenance shutdown starting November 3, which was deferred by one day to November 4. Currently, domestic gas field production has dropped from historical highs of 2,800 MMCFD down to 1,576 MMCFD (as of October 30), forcing heavy reliance on imported LNG handled by Summit and US-based Excelerate Energy. Against a real national demand of 4,000 MMCFD (and authorized customer demand of 5,500 MMCFD), the temporary maintenance will intensify existing pressure constraints across residential and industrial sectors until Saturday afternoon.
— Daily Best News Desk • Fearless in the search for truth
Reported by Staff Reporter • Edited by the Daily Best News desk. Send corrections to [email protected].









